OCGov.com - Orange County - Our Community Out Commitment Directors Name Jess Carbajal Contact the County Orange County Seal
ocpw header banner
Orange County Flood
Haster Basin & Recreational Field EIR Preparation Documents

OC Flood Santa Ana River Project(SARP)

 

Project Description

The Santa Ana River Mainstem Project is located along a 75-mile reach of the Santa Ana River in Orange, Riverside and San Bernardino counties. The plan for flood control improvements includes three principal features:

  • Lower river channel modification for flood control along the 30.5 miles of the Santa Ana River from Prado Dam to the Pacific Ocean.

  • Construction of Seven Oaks Dam (about 3.5 miles upstream of the existing Prado Dam) with a gross reservoir storage of 145,600 acre-feet.

  • Enlargement of Prado Dam to increase reservoir storage capacity from 217,000 acre-feet to 362,000 acre-feet.
OC Flood Popular Links
spacer
 
External Related Links
spacer
AlertOC banner
Public Meeting Calendar
Post burn prepardness guide
Public Meeting Calendar