SARI Mainline Construction Advertisement
County of Orange
Orange County Public Works (OCPW)
Flood Control Division
As of: 3-2-11
ORANGE COUNTY FLOOD CONTROL DISTRICT PROJECTS ADVERTISED FOR CONSTRUCTION
Bid packages are only available by mail or to pick up at OC Public Works Development
Processing Center (DPC) located at:
300 N. Flower St, 1st Floor
Development Processing Center Cashier
Santa Ana, CA 92703-4048
Hours: 7:30 a.m. to 4:00 p.m.
Monday through Friday
Questions concerning the purchase of the Bid Package and obtaining a copy of the
plan holder's list should be addressed to the DPC Cashier, County of Orange, OC
Public Works (714) 834-4585.
SANTA ANA RIVER INTERCEPTOR (SARI) RELOCATION
SARI MAINLINE PROJECT
(INCLUDING METERING STATION)
WITHIN FACILITY E01 AND THE SANTA ANA RIVER TRAIL
From the SAVI Ranch Development to the Green River Golf Club
Bid Opening Date: May 11, 2011 at 2:00 P.M.
Advertising Starts: March 2, 2011
Engineer's Estimate: $77.5 Million (does not include contingency)
Construction Duration: 430 Working Days
Pre-Bid Meeting: A pre-bid meeting was held at 10:00 a.m. on March
17, 2011 at the Green River Golf Club clubhouse located at 5215 Green River Road,
Corona, CA, 92880. Attendance at the pre-bid meeting was not mandatory, but
highly recommended for all contractors bidding the PROJECT. The pre-bid meeting
allowed prospective bidders an opportunity to discuss the PROJECT and receive clarification
on the Bid Package. In order to minimize disturbance to the public (e.g., campers,
golfers, bicyclists, pedestrians, and businesses), non-mandatory job site tours
will be provided and coordinated by MWH, Americas, Inc. Information on the job site
tours was provided during the pre-bid meeting and is announced online at: http://www.ocflood.com/SARI_schedule.aspx
Questions regarding interpretation of the Bid Package were not answered at the pre-bid
meeting, but will be addressed thereafter via issuance of a formal written bulletin.
Subcontractors, material suppliers and vendors were encouraged to attend.
Bulletins/Addenda:
Bulletin No.
1
Bulletin No.
2
Bulletin No. 3
Bulletin No. 4
Bulletin No. 5
Bulletin No. 6
Bulletin No. 7
Bid Package:
Volume 1A: Special Provisions
Volume 1B: Special Provisions
Volume 2: Reduced Size Plans
Volume 3: Geotechnical Data Report
Volume 4: Geotechnical Baseline
Report
Volume 5: Habitat Mitigation and
Monitoring Plan
Reference Reports:
- Geotechnical Interpretive Report
- Water Quality Management Plan
- Planholders
List
- 2-41-2 All Drawings
- 2-14-4 All Drawings
- 2-14-5 All Drawings
Bid Information:
Sealed bid proposals from Contractors shall be sent to the following address:
Bid Proposal for Santa Ana River Interceptor Relocation
SARI Mainline (Including Metering Station)
Office of the Clerk of the Board of Supervisors
Room 101, Hall of Administration
County of Orange
333 West Santa Ana Blvd.
Santa Ana, CA 92703
Submit bid proposals to the above address on or before Wednesday, May 11, 2011 at
2:00 p.m. at which time they will be publicly opened and read in Room 169, 1st Floor,
of the above address.
CEQA Certification and Addendum Approval Dates:
October 6, 2009 and October 20, 2010
|