Haster Basin & Recreational Field EIR Preparation Documents
Haster Basin & Recreational Field EIR Preparation Documents Peter Canyon Wash Mitigation Project

NFC Projects in Design - Haster Basin and Recreational Field Project

Haster Basin and Recreational Field Project

OCFCD Facility No. C05B02/C05PS1
300-ft downstram Haster St. to 800-ft upstream Lampson Ave

Located in Garden Grove
Supervisorial District 1

Project Information

Haster Basin:

This project will improve the storage capacity of Haster Retarding Basin within the East Garden Grove-Wintersburg Channel system. A new pump station and pumps are part of the project, to regulate and optimize the flow from the basin to the downstream channel. Improvements to the adjacent Twin Lakes Park will be constructed in conjunction with the new pump station. Recreational improvements will consist of filling a portion of the retarding basin for a new grass turf area, reconstruction of the basin perimeter multi-use path and replacement of dilapidated picnic tables and benches affected during to construction.

Documents:

C05B02-C05PS1 MapClick map to view PDF

 

 

Photo
CLEAR
K-E Consultant logo image AKM Consulting Engineers  

List of OCFCD Projects Advertised for Construction

OC Flood Popular Links
spacer
 
External Related Links
spacer
AlertOC banner
Public Meeting Calendar
Post burn prepardness guide
Public Meeting Calendar