Orange County Flood
|
|
|
|
|
|
|
|
|
- Flood
Protection Information
Local Flood Hazard,
Flood Safety,
Flood Insurance,
Property Protection Measures,
Natural/Beneficial Functions,
Environmental Engineering,
Map of Local Flood Hazard,
Alert System,
Floodplain Development Permit Requirements,
Substantial Improvement/Damage Requirements,
Drainage System Maintenance,
Protecting Our Waterways,
Floodplain Information & Elevation Certificates,
River Gauge Data (real time),
Flood Warning Information
|
|
|
|
|
|
|
|
|
|
|
|
|
Peter Canyon Wash Mitigation Project
|
|
|
|
OC Flood CEFCAC Funding Criteria
- City Engineer's Flood Control Advisory Committee (CEFCAC)
- CEFCAC Funding Criteria
- CEFCAC Procedure
- Flood Control Project Plan
- Tentative Tract Conditions of Approval
Projects may include preliminary engineering (project reports), final design and
plan preparation, construction, and/or acquisition of right-of-way.
- Facility Classification
- Regional Facilities
In general:
- are designed for 100-year frequency flood protection;
- have a drainage area greater than 1,000 acres;
- have a cross-sectional area greater than 50 square feet;
- have a main-line designation (e.g., A01, F05);
- are owned and maintained by Orange County Flood Control District (OCFCD).
- Subregional Facilities
In general:
- are designed for 100-year frequency flood protection;
- have a drainage area between 640 and 1,000 acres;
- have a cross-sectional area less than 50 square feet;
- have a tributary designation (e.g., F06S03, E01S01);
- must be owned and maintained by OCFCD.
- Local facilities are not eligible for funding.
- Project Priorities
Regional Facilities Regional Facilities & Subregional Facilities
- Relieve existing flooding problem which has caused private property damage and/or
threatened lives
- Remove obstruction/relieve inadequate channel capacity which has high potential
for private property damage
- Remedy high maintenance condition
- Close improvement gaps within existing facilities
- Relieve street flooding or other nuisance flooding as a result of a channel deficiency
- Local agency funding participation
- Approved project report exist
- Completed plans and specifications exist
|
|
|
OC Flood Popular Links
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
External Related Links
|
|
|
|
|